Selected contracts in progress:
-
The project of building a new heating unit with a capacity of 50 MWe and 150 MWt, the fluidzed bed combustion boiler and a backpressure turbine, two boilers and accumulator peak heat in CHP Bielsko-Biała,
-
Complete multibranch building and executive project with obtaining all the necessary arragements and decisions, and the documentation in the SZEOR system, the investment cost estimates, the duties of the author's supervision and subcontracting documentation for the project "Building a new boiler OOG-420 No. 8 in the Department of Power Plant - infrastructure". PKN ORLEN Płock,
-
Complete multibranch and executive project with documentation in SZEOR system, the duties of the author's supervisions and subcontracting documentation for task "CHP fuel system modernization: in PKN ORLEN,
-
Preparation of design documentation, technical specifications of performance and acceptance of construction works, the investment cost estimates and the duties of the author's supervision for the construction of iron removers in the Department of Water Production "Na Grobli" in Wrocław,
-
Design works - EC2 steam - gas block building in PEC Siedlce. Preliminary design work.
|
|
|
|
|